storage

Egypt

Scatec signs landmark PPA in Egypt for 1.95 GW Solar and 3.9 GWh BESS capacity

Renewable energy solutions provider Scatec ASA has signed a Power Purchase Agreement (PPA) with the Egyptian Electricity Transmission Company (EETC) for a total capacity of 1.95 GW Solar and 3.9 GWh Battery Energy Storage Systems (BESS) in Egypt.
Courtesy of US Bureau of Land Management.
Courtesy of US Bureau of Land Management.

Under the agreement Scatec will deliver an integrated Solar and BESS hybrid system designed to deliver continuous, around-the-clock renewable baseload power, and will also develop two standalone BESS projects aimed at providing essential grid stability and support services. The intention is to develop the largest solar and BESS installation in Africa. This represents the largest investment by Scatec thus far.

“Signing this groundbreaking PPA further cements Scatec’s leading position and commitment to delivering reliable, renewable energy at a large scale in Africa” said Scatec CEO Terje Pilskog. “By integrating advanced solar and battery technologies, we are providing Egypt with sustainable, around-the-clock power and grid stabilising services, supporting both the country’s energy transition and the region’s long-term economic development.”

The 25-year USD-denominated pay-as-produced Power Purchase Agreement (PPA) will be linked to the electricity generated by the hybrid system, which is expected to deliver approximately 6,000 GWh of renewable energy annually.

Scatec, the lead developer of the projects, will provide Engineering, Procurement and Construction (EPC), Asset Management (AM) and Operations & Maintenance (O&M) services for the projects. The company will utilise its expertise from similar large-scale hybrid and BESS projects, to ensure efficient delivery and management through all phases of the project. It also intends to invite additional equity partners, with further details on capital expenditure, EPC scope and financing structure disclosed at financial close, which is expected in the second half of 2026.

For additional information:

Scatec ASA

Baterías con premio en la gran feria europea del almacenamiento de energía
El jurado de la feria ees (la gran feria europea de las baterías y los sistemas acumuladores de energía) ya ha seleccionado los productos y soluciones innovadoras que aspiran, como finalistas, al gran premio ees 2021. Independientemente de cuál o cuáles sean las candidaturas ganadoras, la sola inclusión en este exquisito grupo VIP constituye todo un éxito para las empresas. A continuación, los diez finalistas 2021 de los ees Award (ees es una de las cuatro ferias que integran el gran evento anual europeo del sector de la energía, The smarter E).