wind

Availon wins full maintenance contract for Vattenfall’s wind farm

Availon has been awarded a complete maintenance contract for Vattenfall’s 12MW Jänschwalde wind farm, located near Cottbus in the German federal state of Brandenburg.
Availon wins full maintenance contract for Vattenfall’s wind farm

“We have worked with Vattenfall on this project since 2012. The partnership resulted in great success, and we are very pleased that Vattenfall has decided to hand us over the responsibility for servicing their entire 12 MW wind farm”, said Markus Spitzer, the company's managing director.

Availon has been maintaining three of the turbines since 2012, and it has now taken over the responsibility for all of the wind farm’s 2MW Vestas V90 turbines, through a full maintenance service agreement known as WindKeeper Complete.

In addition to comprehensive maintenance services and the provision of numerous upgrades, the WindKeeper Complete maintenance package developed by Availon also includes the replacement of major components, and an availability guarantee.

For additional information:

Availon

Tags: Wind , wind farm
Baterías con premio en la gran feria europea del almacenamiento de energía
El jurado de la feria ees (la gran feria europea de las baterías y los sistemas acumuladores de energía) ya ha seleccionado los productos y soluciones innovadoras que aspiran, como finalistas, al gran premio ees 2021. Independientemente de cuál o cuáles sean las candidaturas ganadoras, la sola inclusión en este exquisito grupo VIP constituye todo un éxito para las empresas. A continuación, los diez finalistas 2021 de los ees Award (ees es una de las cuatro ferias que integran el gran evento anual europeo del sector de la energía, The smarter E).