wind

Nordex Group Receives Orders From DenkerWulf for 123 MW in Germany

The Nordex Group has received three orders from DenkerWulf, one of Germany’s leading onshore wind farm developers, for a total of 25 wind turbines with a combined capacity of 122.7 MWs. To ensure the sustainable operation of the turbines after commissioning in 2028, Nordex will also maintain all turbines under a premium service contract for 20 years.
 Delta 4000 N149/5.X Wind Turbines
Delta 4000 N149/5.X Wind Turbines © Nordex

The three wind farms are being built in Schleswig-Holstein: Starting in 2027, the Nordex Group will install three N149/5.X turbines at the Galmsbüll Bahrenhof wind farm, 18 N133/4800 turbines at the Galmsbüll Park wind farm, and another four N133/4800 turbines at the Padenstedt wind farm.

The hub heights of the turbines at the projects in Galmsbüll near the North Sea coast range between 105 and 110 meters, while in Padenstedt, located inland, turbines with hub heights between 110 and 125 meters are being used.

“Our renewed strong commitment underscores the close and flexible partnership with Nordex. We are especially pleased that we have successfully completed the repowering in Galmsbüll—a location with very strong wind conditions—together with the community wind farm.

"Thanks to the high speed of project implementation, we recently surpassed the milestone of 500 MW of commissioning in Germany with Nordex. Despite challenging conditions, we look forward to continuing this successful partnership. Together, we will continue to realize innovative projects and advance the energy transition,” said Thomas Behrendt, Head of Wind Turbine Procurement and Site Manager Rostock at Denker & Wulf AG.

Karsten Brüggemann, Vice President Region Central of the Nordex Group, added, “We are pleased to have received further orders from DenkerWulf. With nearly 144 MW of new orders this year, Galmsbüll, with its 18 turbines, is also one of our largest projects in Germany. By deploying Nordex turbines in these new projects, we are supporting DenkerWulf in the sustainable production and supply of electricity in northern Germany.”

Baterías con premio en la gran feria europea del almacenamiento de energía
El jurado de la feria ees (la gran feria europea de las baterías y los sistemas acumuladores de energía) ya ha seleccionado los productos y soluciones innovadoras que aspiran, como finalistas, al gran premio ees 2021. Independientemente de cuál o cuáles sean las candidaturas ganadoras, la sola inclusión en este exquisito grupo VIP constituye todo un éxito para las empresas. A continuación, los diez finalistas 2021 de los ees Award (ees es una de las cuatro ferias que integran el gran evento anual europeo del sector de la energía, The smarter E).