biogas

Bio-CNG Powered Buses in Estonia Fueled by Bright’s Technology and Bioforce

City buses in Tallinn, Estonia run on bio-CNG fueled by Bright’s biogas upgrading technology and commissioned by energy company Bioforce OU. The bio-CNG production site in Aravete has been operational since March this year and recently has been expanded. A new bio-CNG production facility will be built in Ebavere and is expected to be completed in the third quarter of 2023. Through virtual pipeline technology, the bio-CNG is transported to filling stations where buses can refuel.
Bio-CNG Powered Buses in Estonia Fueled by Bright’s Technology and Bioforce
Courtesy of Bright Renewables

Capacity at the Aravete facility was expanded this year from 800 Nm3/hr ingoing biogas to 1,000 by adding membranes. Capacity expansion to 1,200 Nm3/hr ingoing biogas is scheduled in the near future. Project Ebavere will be capable of taking in 800 Nm3/hr biogas and is expandable to 1,200 Nm3/hr.

Martins Dombrovskis, Area Sales Manager at Bright, said, “Bio-CNG is one of the great usages of biomethane that can be relocated to anywhere. With our local team in Latvia, and the team in the Netherlands, we are proud to be the technology provider to Bioforce for the realization of domestic production and usage of biomethane."

Bioforce supplies the bio-CNG for Tallinna Linnatransport AS, a company owned by the city of Tallinn, and is dedicated to the utilisation of clean fuels in Estonia. 

“The transport sector has a key role in reducing greenhouse gas emissions. One way to make Estonian transport sector more sustainable is to use renewable natural gas. We are strongly committed to driving this cleaner future for this sector in Estonia and are happy to take up this challenge with Bright to achieve this goal”, says Henry Uljas from Bioforce. 

Virtual pipeline 

In these projects, first biogas is produced from anaerobic digestion of cow manure. This needs to be purified and compressed before reaching the state of bio-CNG

Bright supplies the biogas upgrading system with membrane technology to upgrade biogas to biomethane. After compression to bio-CNG, the fuel can be stored and transported. Through a virtual pipeline, the bio-CNG is transported to the Peterburi Street CNG filling station in TallinnVirtual pipeline is a technology used at production sites where no pipelinegrid infrastructure or filling station is available. 


Baterías con premio en la gran feria europea del almacenamiento de energía
El jurado de la feria ees (la gran feria europea de las baterías y los sistemas acumuladores de energía) ya ha seleccionado los productos y soluciones innovadoras que aspiran, como finalistas, al gran premio ees 2021. Independientemente de cuál o cuáles sean las candidaturas ganadoras, la sola inclusión en este exquisito grupo VIP constituye todo un éxito para las empresas. A continuación, los diez finalistas 2021 de los ees Award (ees es una de las cuatro ferias que integran el gran evento anual europeo del sector de la energía, The smarter E).