wind

Vestas China receives 48.6 MW initial order for V100 turbine

Vestas China has received a 48.6 MW order for its V100 turbine from Datang Hubei Renewable Energy, the first for this new addition to the its 2 MW platform in China.
Vestas China receives 48.6 MW initial order for V100 turbine

The order represents not only an important step further into the low wind regime in China, but also a step into the new geographical market of the Hubei province.

The 27 units of V100-1.8 MW turbines with a total capacity of 48.6 MW will be installed in the Long Ganhu wind farm in intensively energy consuming area of the the Hubei province, a low-wind site with an average wind speed at 5 m/s.

According to Datang Renewable, the successful application of Vestas’ V100 at this wind site will set an example for distributed wind power at low-wind sites in other provinces, and the open-up in the Hubei province will bring new business opportunities for Vestas.

“The low-wind sites in China is a new market of huge potential, but a new market also implies new challenges for wind power developers,” said Jens Tommerup, President of Vestas China. “It is therefore important to choose a proven and reliable technical platform and well-recognized business partners.

“Datang Renewable’s selection of Vestas for low-wind sites is the best recognition of our long-term cooperation. The contract is of great significance to us; it not only helps us open up a new market, but also firms our steps towards the exploitation of the dominant wind regime in China,” Tommerup said.

The V100 turbine is especially developed for low wind sites and designed on the proven 2 MW platform. With gradually fewer high wind sites to be exploited globally, low-wind sites are attracting the focus of the wind power developers.

The 2 MW platform with a 100 metre rotor diameter for low wind conditions has since its introduction won customers’ recognition in Europe, North America, South America, the Mediterranean area as well as in Asia. As of mid-2011, the V100 had a track record of 180 units installed globally.

Currently, Vestas’ integrated manufacturing complex in Tianjin is one of the three global manufacturing complexes that are able to produce the V100 turbine.

The new contract includes delivery, transportation, installation supervision and commissioning of the wind turbines, as well as a two-year service and maintenance agreement. The first turbines are scheduled to be delivered in the second quarter of 2012.

For additional information:

Vestas China

Baterías con premio en la gran feria europea del almacenamiento de energía
El jurado de la feria ees (la gran feria europea de las baterías y los sistemas acumuladores de energía) ya ha seleccionado los productos y soluciones innovadoras que aspiran, como finalistas, al gran premio ees 2021. Independientemente de cuál o cuáles sean las candidaturas ganadoras, la sola inclusión en este exquisito grupo VIP constituye todo un éxito para las empresas. A continuación, los diez finalistas 2021 de los ees Award (ees es una de las cuatro ferias que integran el gran evento anual europeo del sector de la energía, The smarter E).