The acquisition from third parties brings the total operating capacity of the wind farm to 14 MW and enlarges the portfolio that European Energy and NEIF hold together to 48 MW.
The Altlandsberg wind farm is equipped with Vestas turbines which became operational in 2003.
European Energy will invest in the project as a minority shareholder alongside NEIF and will manage the additional capacity together with the existing portfolio that the parties hold.
The German onshore wind sector is one of the core sectors of NEIF and European Energy.
The financial terms of the initiative have not been disclosed.
For additional information: