wind

Romania

Vestas signs 269 MW order to complete second phase of Romania’s largest wind farm

First Look Solutions S.R.L., a subsidiary of Rezolv Energy, has placed a 269 MW order with Vestas to complete the second phase of Vifor wind farm in Buzău Country, Romania.
Vestas signs 269 MW order to complete second phase of Romania’s largest wind farm
Vifor wind farm, Romania. Courtesy of Rezolv Energy.

Once both phases are fully operational, the Vifor project will become the largest wind farm in Romania and one of the largest onshore wind farms in Europe, with a total capacity of 461 MW.

The phase II order includes 42 V162-6.4 MW turbines of the EnVentus platform. Vestas will also provide long-term service for the project through a 15-year Active Output Management 5000 (AOM 5000) agreement.

“We are delighted to contribute to Romania’s energy transition through the realisation of the country’s largest wind farm” said Srdan Cenic, Vestas Mediterranean East General Manager. “Vestas continues to lead the market thanks to our strong local infrastructure, including five service hubs and a regional training centre.”

Turbine delivery for phase II is planned for the second half of 2026, with commissioning scheduled for the second half of 2027. Vifor phase I is currently under construction, with Vestas providing full engineering, procurement, and construction (EPC) solutions, along with 30 V162-6.4 MW turbines.

“Rezolv’s Vifor wind farm is an iconic project which is helping to position Romania at the forefront of Europe’s clean energy transition” added Alastair Hammond, CEO, Rezolv Energy. “From the start, the project has been designed to ensure the maximum possible reduction in emissions, and the 6.4 MW turbines from Vestas – the most powerful ever installed in Romania – will be crucial in delivering this impact.”

Vestas has played a key role in advancing wind energy in Romania since entering the market in 2009. With nearly 2 GW of capacity either installed or under construction, Vestas is currently the leading wind OEM in the country. The company’s Eastern European regional headquarters is located in Bucharest and employs over 550 people across Romania, including a highly skilled team of service technicians supporting ongoing projects.

For additional information:

Vestas

Rezolv Energy

Baterías con premio en la gran feria europea del almacenamiento de energía
El jurado de la feria ees (la gran feria europea de las baterías y los sistemas acumuladores de energía) ya ha seleccionado los productos y soluciones innovadoras que aspiran, como finalistas, al gran premio ees 2021. Independientemente de cuál o cuáles sean las candidaturas ganadoras, la sola inclusión en este exquisito grupo VIP constituye todo un éxito para las empresas. A continuación, los diez finalistas 2021 de los ees Award (ees es una de las cuatro ferias que integran el gran evento anual europeo del sector de la energía, The smarter E).